Skip to main content
Public Sector

Multi-Discipline Park Design in Weston, FL

Goal

Designing and engaging a useful park experience

Result

102
Acres of designed play

Service Lines

Civil Engineering

Landscape Architecture

CM/PM

Electrical Engineering

Surveying

Environmental

GIS Services

The SAFEbuilt team has worked with the City of Weston on several renovation and improvement projects at Regional Park since 2003. Projects included the original park design, incorporate of a YMCA building and pool, ADA issues, and traffic engineering studies.

Weston’s Regional park covers 102 acres and has been called the parks of eights as it provided for eight (8) Baseball / Softball fields, eight (8) Football / Soccer fields, and eight (8) Basketball courts. The park also features:

  • Weston Community Center and Park Administrative offices,
  • four (4) Full size roller hockey rinks,
  • three (3) Junior size roller hockey rinks,
  • one (1) Skate Park,
  • two (2) Shaded Playgrounds (1 universally accessible),
  • three (3) Sand volleyball courts,
  • two (2) Shaded Playgrounds,
  • one (1) Event Stage,
  • five (5) Concession stands with restrooms,
  • three (3) Picnic shelters with tables and grills,
  • exercise trail with over 8,000 linear feet,
  • Sports field lighting and
  • 1,300 parking spaces.

The most recent improvement to the park was the design services to two of the existing Soccer Fields from natural grass to artificial turf fields. The scope of work included the artificial turf and irrigation system construction design documents including project plans, technical specifications as well as environmental resource permit modification for the park site.

The artificial turf field drainage system was integrated with the existing drainage system of the park and the master surface water management system of the Indian Trace Development District. The team worked closely with the City of Weston’s Parks Department staff to research and investigate various artificial turf products to be considered for the project scope. The team recommended and ultimately utilized a design solution that offered the City the most cost-effective construction cost with the least amount of disturbance to the existing site and park operations.

Additional Case Studies

Zoning Code Update and Strategic Build-Out Plan

Converting a Conventional Code into and Instructive Set of Hybrid Zoning Regulations

Private: Realigning Operations After A Growth Boom

Having the Right Number of People, With the Right Expertise, When You Need Them.

Your Partner in Business

For Solutions that are custom fit to your needs.
Contact SAFEbuilt